Quality control in Vietnam
We inspect your footwear inside the factories of Vietnam with our own technicians, since 1998. Photographic report within 24 hours and an ISO 9001:2015 certified quality system.
Book an inspection
In Vietnam since 1998
LexelArt has worked in Vietnam since 1998, based in Ho Chi Minh City. We were the first Spanish footwear company established in Vietnam. We know the factories from the inside because we are in them every day.
Our inspectors are footwear technicians with more than ten years of experience. They check every order against the tech pack and the approved sample, and speak the language of both the factory and the brand.
Office: LexelArt VN Co., Ltd · Villa 61D, Street No. 2, Binh Khanh 2 Hamlet, Ho Chi Minh City.
What is included
- 01
Pre-production inspection (PPI)
Before cutting: materials, components and colours against approved samples and the regulations of your market.
- 02
During-production inspection (DPI)
At 10–70 % produced: workmanship and conformity on the line, so issues are corrected before the run ends.
- 03
Pre-shipment inspection (PSI)
With at least 80 % packed: final random inspection against the order, with AQL sampling.
- 04
Container loading supervision (CLS)
During loading: quantities, cartons, carton marks and container condition.
- 05
Anti-mould inspection
Moisture checks on shoes, boxes and warehouse before packing and loading; verification of desiccants, anti-mould treatments and container conditions.
- 06
Laboratory testing
We coordinate with TÜV the physical and chemical tests your market requires, such as REACH or CPSIA.
- 07
Factory audit
On-site visit to assess capacity, processes and quality system before you place an order.



Coverage and booking lead times
- 01
Ho Chi Minh City and provinces within 3 hours
Ho Chi Minh City, Bình Dương, Đồng Nai, Long An, Tây Ninh, Tiền Giang, Bình Phước and Bà Rịa–Vũng Tàu: the main footwear manufacturing hub in the country. Book with 48 to 72 hours’ notice.
- 02
Rest of Vietnam
Mekong Delta (Cần Thơ, Vĩnh Long, An Giang), central Vietnam (Đà Nẵng, Quảng Nam, Khánh Hòa) and the north (Hà Nội, Hải Phòng, Hải Dương, Thái Bình, Nam Định, Thanh Hóa): any factory more than 3 hours by car from Ho Chi Minh City. Book with 5 working days’ notice.
- 03
Lead time depends on the inspection type
A pre-shipment inspection (PSI) or a container loading supervision is scheduled around the end-of-production date; a PPI or DPI, around the factory’s calendar. We confirm date and technician once we receive your order and the factory address.
Defects we find most often
- 01
Sole separation
Poor bonding between upper and sole: we check it by hand on every sampled pair and, where needed, request a bond strength test at the laboratory.
- 02
Glue marks and dirt
Adhesive, primer or pen marks on the upper and welt; they are cleaned on the line before packing.
- 03
Measurement and symmetry deviations
Differences in heel height, shaft height or width between left and right shoes, measured with calliper and tape against the tech pack.
- 04
Colour differences between components
Different shades within a pair or between pairs, against the approved colour standard.
- 05
Irregular stitching
Skipped stitches, wrong stitch density or loose threads, especially in stress areas.
- 06
Moisture and mould
Vietnam’s climate makes it essential to control the moisture of shoes, boxes and container before shipment.
AQL sampling to ISO 2859-1
How we work
You send us the order
Tech pack, approved sample, quantities and planned ship date.
We schedule the visit
We agree the date with the factory according to the real progress of production.
We inspect on the line
Measurements, materials, stitching, bonding, finish and packaging, with photographs of every finding.
You receive the report
Within 24 hours: classified defects, AQL result and a recommendation to approve, correct or hold.
Frequently asked questions
How long have you worked in Vietnam?
Since 1998, with our own team in Ho Chi Minh City.
How far in advance do I need to book an inspection in Vietnam?
48 to 72 hours’ notice in Ho Chi Minh City and provinces within 3 hours by car (Bình Dương, Đồng Nai, Long An, Tây Ninh, Tiền Giang, Bình Phước and Bà Rịa–Vũng Tàu). For the rest of Vietnam, 5 working days. The exact lead time depends on the inspection type.
Which provinces of Vietnam do you cover?
The whole country: Ho Chi Minh City and the industrial south (Bình Dương, Đồng Nai, Long An, Tây Ninh, Tiền Giang), the Mekong Delta, central Vietnam (Đà Nẵng, Quảng Nam) and the north (Hà Nội, Hải Phòng, Hải Dương, Thái Bình, Nam Định, Thanh Hóa).
Which inspections do you carry out in Vietnam?
Pre-production (PPI), during production (DPI), pre-shipment (PSI) and container loading supervision (CLS), plus factory audits and coordination of laboratory testing with TÜV.
On what criteria is an order accepted or rejected?
AQL sampling to ISO 2859-1: 0 for critical, 2.5 for major and 4.0 for minor defects, unless your brand sets other levels.
When do I get the report?
Within 24 hours of the inspection, with photographs, classified defects and a clear recommendation.
Do you only inspect footwear?
We specialise in footwear and its components: it is what we know in depth, from the last to the packaging.
